Solvay Chemical Plant

Scope: Package Boiler Installation

Client: Concord Engineering

Location: Baton Rouge, LA

Delivery Method: General Contractor

Casey Industrial was contracted for the mechanical installation of a new 132,000 pound/hour package boiler plant, including packaged DA skid and packaged condensate skid with supporting equipment and piping interconnections. Tie-ins and interconnections from noted existing plant points to the pipe rack drop out location at the new plant were also included. After successful start-up of the new “Jennifer” boiler, Casey relocated an existing refurbished boiler to the new plant location.