YTMM Tire Facility

Scope: Mechanical, Electrical, Piping

Client: General Contractor

Location: West Point, MS

Delivery Method: General Contractor

This plant is the first automated tire manufacturing facility in the world. Casey Industrial was contracted to install two parallel rubber extruder lines, including mechanical, electrical, and piping work to bring the extruder lines into operation. Associated work included unloading, unpacking of equipment, layout, motor coupling, grouting, anchoring, and supply and install of electrical, piping, ducting, and platforms.