LCEC Generation Plant

Scope: 46 MW Peaking Plant

Client: Lea County Electric Cooperative

Location: Lovington, NM

Delivery Method: General Contractor

Casey Industrial was contracted to install five Wärtsilä 20V34SG gas engine generators for this 46 MW facility. Casey installed foundations, concrete structures, and associated equipment, including selective catalytic reduction units to reduce greenhouse gases and NOx emissions. Electrical work included electrical wiring, cable tray, conduit, and all power and control wiring connections.

Installed 9,400 linear feet of conduit, 130,140 linear feet of wire, 10,056 terminations, 108 tons of structural steel, and 11,398 linear feet of piping.