Chemical Distribution Facility

Scope: Chemical Loading System

Client: Nexeo Solutions, LLC

Location: Denver, CO

Delivery Method: General Contractor

Casey contracted with Nexeo Solutions to complete installation of a new chemical unloading/loading system. Installation of the system included a new indoor tank farm, which incorporated six new polyethylene storage tanks inside a concrete containment structure, structural catwalk to provide access to the tanks, an outdoor truck loading area with piping and hose fittings, and an outdoor canopy. Associated work included concrete demolition, foundation installation, piping, and electrical/I&C work.